Solving Problems: MCE Case Studies
Explore real MCE customer success stories across automation, controls, fluid power, electrical, and industrial process applications.
Featured Case Study
A New Pump Design Fixes Wastewater Clogs
We documented several real-world cases where municipal customers struggled with chronic pump failures.
In one case, a large Florida city worked with us on a side-by-side trial: a new ShinMaywa pump next to an existing competitor’s pump.
Result: The competitor pump clogged within days; the ShinMaywa provided by MCE virtually eliminated clogging.
Several other cities reported similar experiences.
All MCE Case Studies
01.22.2026
Why MCE Trusts Ashcroft Sanitary Pressure Gauges for High Hygiene Requirements
In industries where purity, product integrity, and regulatory compliance are non-negotiable, sanitary instrumentation plays a critical...
01.20.2026
Fixing Wastewater Pump Clogs: Success Stories from Florida Municipalities
Florida’s rapid population growth is putting enormous pressure on its aging municipal infrastructure, especially lift stations and pump...
01.16.2026
Success Story: Hands-Free Fastener Delivery: How Industrial Control Used AMRs to Automate Heavy Material Transport
By integrating MiR autonomous mobile robots with custom engineering, MCE helped a manufacturer transform a labor-intensive, injury-prone...
12.17.2025
Success Story: How MCE Helped a Food Plant Maintain Chocolate Viscosity with Heat Trace Systems
In a chocolate-making facility, uninterrupted flow is everything. A single blockage can halt production and trigger hours of cleanup.
12.02.2025
Success Story: Manual to Mission-Ready – Modernizing Aerospace Hydraulic Test Systems
The Challenge A division of a major aerospace manufacturer required a reliable method to test and certify critical hydraulic components...
10.15.2025
Solving Chilled Water Failures at Sea: MCE, ASCO, and the Navy Partner on a Retrofit Success
MCE is a trusted valve and instrumentation supplier for Navy, OEM, and shipyard applications. Partnering with ASCO, a leading valve...
08.06.2025
Smart Flow Control: MCE’s Impact on High-Temp Systems
MCE: Creating a Partnership Built on Responsiveness and Results
06.17.2025
How Smarter Lubrication Cuts Costs and Downtime
Industrial plants lose millions every year due to equipment failures caused by inconsistent lubrication. MCE’s automated lubrication...
05.07.2025
From Downtime to Uptime: MCE’s Filtration Fix for Automotive Paint Production
Closing the Gaps in Paint Production: How MCE Delivered a Full-System Filtration Upgrade
03.07.2025
Getting a Railway Systems Company Back on Track: Case Study
The Problem: A railway systems company was experiencing issues with a twenty-year-old motor. Their production line starts with a conveyor...